FlagCo
Flagpole Deliveries
WORKING MOCKUP
Interactive mockup, seeded from a read-only snapshot of the live delivery tracker (Aug 27). The cut schedule below was auto-built from those real orders using the scheduling rules. Nothing here writes back to the real tracker. Everything is clickable; Reload or Reset restores the snapshot. Read the plan.
Poles needing a slot
Cut board Synced from Darrell's Pole Production Schedule (Aug 31). Rolling four weeks; 2 poles per day, slot 3 is overtime. Drag a pole to reschedule, or click a job to mark it complete.
Legend: green check = complete · red outline = rush · amber dashed = overtime slot · gray dashed = open · prep lane = external pick and pack (no cut slot used) · "frozen" = today and the next two working days: moving a scheduled job there needs a reason (filling an open slot stays free)